Some of the projects implemented:

• District heating of Pristina (Coogeneration)

• Hydraulic ash transportation TPP Kosova A

• Reconstruction of storage and dosage of lime on the decarbonizing block A4 - Power Plant Kosovo A

• Supply and maintenance of electronic modules KURP Pristina Regional Water

• Supply with supervision and protection from corrosion of the main mining equipment for mining "Sibovc south west"

• Repair of measurement, regulation and commanding in block A5 - Power Plant Kosovo A

• Reconstruction of measuring circuits for the metal temperatures in boiler - Power Plant Kosova B

• Repair of circular movement of the excavator E7-B

• Repair of circular movement of the excavator E6-M

• Repair of the dosing system for chemical material (hydrazine)

• Repair and improvement of the system in PKU, Power Plant Kosovo B

• Design of the commanding cabinet for heating

• Repair of circuits for measuring temperatures in Boiler at block B1 and B2

• Supply and installation of electromagnet's for coal conveyor belts for Mining

• Design and implementation of protective scheme of heating Changers - Factory tools

• Supply of spare parts and repair of hydraulic adjustment valve cabinet of JA01 (block B1 and B2) – Power Plant Kosovo B

• Installation and updating of software for PLC's, software updating for WINCC

• Sensors for speed measuring